GMDA to Revamp 125-Km Service Roads Across Gurugram Sectors 1–57: Smooth Commutes Ahead.

GMDA service roads work

GMDA Plans Major Service Road Revamp Across Gurugram Sectors 1–57

Gurugram is set for a transformational infrastructure upgrade. The Gurugram Metropolitan Development Authority (GMDA) has announced plans to revamp service roads across sectors 1 to 57, covering a 125-kilometer network. This large-scale initiative aims to strengthen roads, remove bottlenecks, improve drainage, and enhance pedestrian safety, creating a smoother and safer commuting experience. The project is expected to begin in March 2026, promising significant improvements in traffic flow across the city.

Strengthening Roads to Ease Congestion

A primary goal of this project is to strengthen existing roads and expand their carrying capacity. Many service roads currently face bottlenecks, encroachments, and uneven surfaces, which cause frequent traffic jams, especially during peak hours. By removing obstacles and standardizing road quality, GMDA aims to deliver uniformity and reliability across all master sectors.

Improved road infrastructure will result in smoother rides, shorter travel times, and reduced congestion. The upgrades will also prepare the city for future traffic growth, ensuring that commuters and businesses experience consistent and efficient transport networks.

Upgrading Drains and Footpaths

Waterlogging remains a pressing challenge during Gurugram’s monsoon season. To address this, GMDA plans to make every drain fully functional, preventing water stagnation and ensuring roads remain safe during heavy rains. Alongside drainage improvements, footpaths will be repaired and upgraded, providing safe walkways for pedestrians and encouraging a more walkable city environment.

The focus on pedestrian safety ensures that commuters, students, and residents can move around the city safely, reducing the risk of accidents and enhancing urban livability. Properly maintained footpaths combined with functional drainage will also prevent street damage and improve long-term road durability.

Removing Encroachments and Bottlenecks

Encroachments and incomplete roads reduce efficiency and create traffic choke points. The revamp will clear these obstructions, remove bottlenecks, and standardize road widths across all sectors. This will ensure seamless vehicle movement, particularly in densely populated commercial and residential areas.

Clearing obstructions will also create predictable travel times, making daily commutes less stressful. Residents, office-goers, and delivery services will benefit from improved logistics efficiency, while local businesses will enjoy better accessibility and smoother operations.

Integrated Development for Uniform Quality

GMDA’s approach emphasizes integrated development, ensuring that the service road network maintains uniform quality and performance. The authority is finalizing detailed plans, with work allotment expected by March 2026. A coordinated development strategy will prevent patchwork maintenance, reduce long-term repair costs, and guarantee lasting improvements in road infrastructure.

By applying systematic upgrades, GMDA ensures that all sectors receive equal attention, resulting in smoother traffic flow, safer roads, and consistent urban aesthetics throughout Gurugram.

Enhancing Urban Mobility

The revamp aligns with Gurugram’s broader vision of modern urban mobility. Since GMDA assumed responsibility for service roads in 2023, the focus has been on efficient traffic management, sustainable infrastructure, and better connectivity. These upgrades will support both residential and commercial growth, enhancing accessibility, convenience, and overall city experience.

Expert Advice

GMDA to revamp 125 km of service roads in Gurugram sectors 1–57

Sanjeev Singh, MD, SKJ Landbase, shared his perspective on the importance of infrastructure development:

“Infrastructure improvements like these directly impact residents’ quality of life. Smooth roads, functional drains, and safe footpaths create a city that works efficiently and feels welcoming. Real estate growth also thrives when basic infrastructure meets modern standards.”

Project Timeline and Execution

The project will be executed in phases to minimize commuter disruption. The 125-km network will undergo comprehensive upgrades, including road strengthening, functional drainage installation, pedestrian safety measures, and bottleneck removal.

Even during the initial phases, residents can expect visible improvements, such as smoother traffic flow, safer pedestrian movement, and reduced waterlogging. Local businesses will benefit from reliable transport networks, which improve logistics and ensure timely deliveries.

Long-Term Impact on Gurugram

The revamp is more than just a road repair initiative; it is a strategic investment in Gurugram’s urban future. Once completed, the project will deliver:

  • Reduced traffic congestion and smoother vehicular movement
  • Safe and upgraded pedestrian pathways
  • Effective drainage to prevent waterlogging
  • Consistent road quality across sectors
  • Enhanced accessibility for commercial and residential areas

These upgrades will improve daily commuting experiences, support business growth, and enhance overall city livability, creating a modern, efficient urban environment.

Conclusion: A Smarter Gurugram

The GMDA’s service road revamp represents a significant step toward a modern, livable city. Through road strengthening, drain upgrades, footpath repairs, and bottleneck removal, Gurugram is preparing for a future-ready urban environment.

Residents can look forward to smoother journeys, safer streets, and improved city infrastructure. With work beginning in March 2026, the city is poised to transform its service road network into a model of efficiency, safety, and urban planning excellence.

Join The Discussion

Compare listings

Compare